1 · Executive Summary
Q1 Gas distribution and operational priorities
Total flared volume
9.04
million sm3
Total CO2 emitted
18.22
million kg
Anomaly hours
611
across 13,032 hours
Plant event recall
75%
3/4 events detected
THE PROBLEM
- Global flaring emitted 350M tonnes of CO2 in 2023 (World Bank).
- The Zero Routine Flaring initiative provides international context for reducing routine flaring. It does not establish regulatory obligations for the simulated facilities.
- The Trap: Operators often blame high volume, not inefficiency, for their flaring footprint.
THE SOLUTION
- We built a truth-blind anomaly detector (Interquartile Range [IQR] + Median Absolute Deviation [MAD]) across 13,032 operational hours.
- We separated Volume effects (size) from Intensity effects (inefficiency).
THE RESULT
- Approximately 79% of the recorded excess flaring attribution for FL-A was associated with modeled throughput. This decomposition does not establish actual operating efficiency.
- The Catch: The detector caught 3/4 structural events. Missing the 4th exposed a critical blind spot - throughput spikes mask flare intensity.
- Operational implication: Automated anomaly screening could help prioritize investigations. Prevention of compressor failures has not been demonstrated.
IQR (Interquartile Range): A statistical measure of spread used for the Tukey fence anomaly detector.
MAD (Median Absolute Deviation): A robust statistical measure used for the z-score anomaly detector.
SCADA: Supervisory Control and Data Acquisition (industrial control systems).
TP/FP/FN/TN: True Positive / False Positive / False Negative / True Negative (confusion matrix terms).
2 · Trend
Q2 Temporal trends and operating variability
- No monotonic trend across the 6-month window - flaring fluctuates within the IQR band for all three stacks.
- FL-A has the highest mean intensity (0.064); FL-C the lowest (0.061).
- Some flagged hours coincide with planted structural events. False-positive and missed-event results limit interpretation.
3 · Hotspots
Q3 Stack-level and monthly intensity patterns
- Peak cell: FL-A in 2025-04 at intensity 0.115 - the single worst stack-month pair.
- Risk concentrates in a small number of cells - consistent with a Pareto pattern (see §4).
- Month-to-month spread is modest for FL-C (well run), wider for FL-A/FL-B - suggesting event-driven variation, not baseline drift.
4 · Attribution: Throughput and Flaring Intensity
THE REALITY CHECK
- The Pareto chart identifies high-volume contributors but does not normalize for throughput.
- The waterfall decomposition attributes the modeled difference primarily to throughput.
- Volume and intensity should be evaluated together. Neither indicator alone establishes comparative operating efficiency.
OPERATIONAL IMPLICATIONS
- The relative roles of processing capacity, operating conditions and flare intensity warrant further investigation before intervention.
Q4 Principal contributors and underlying factors
- FL-A (3.60 M sm3) and FL-C (2.87 M sm3) are the top two; the largest alone holds 40% of volume.
- Waterfall decomposition shows the volume effect dominates - this is a size story more than an efficiency story.
5 · Anomaly Detection Performance
Event recall
75%
3/4 events
Hour recall
28.9%
319 of 1104 event hours
Hour accuracy
91.7%
11,955 of 13,032 hours
Baseline MAE
5.75
sm3/h (non-event hours)
Hour-level confusion matrix (13,032 hours)
| Predicted anomaly | Predicted normal | Total true | |
|---|---|---|---|
| True event hour | 319 (TP) | 785 (FN) | 1,104 |
| True normal hour | 292 (FP) | 11,636 (TN) | 11,928 |
DETECTION LIMITATIONS
- We missed 1 event (high-throughput spike).
- Why? Throughput up = intensity down. The machine only watches intensity.
- Automated alerts require contextual review because operating changes can affect the detector's sensitivity.
ILLUSTRATIVE ECONOMIC SCENARIO
- False Alarm: ~$500 (manual inspection).
- Missed Outage: $50,000+ (fines + lost gas).
- Illustrative cost scenario: All 48 hours of the single planted compressor-outage scenario were flagged. This does not establish detection performance for other compressor outages. The 292 false-positive hours illustrate potential review workload. An assumed USD 500 charge per false-positive hour would imply USD 146,000 in review costs. Actual costs depend on alert grouping and operating procedures. No avoided failures or realized savings were demonstrated.
Q5 Detection performance against planted events
- 3/4 planted events detected (75% recall). Recorded event-level precision was 2.34% under the implemented event/alert-episode scoring convention. The evaluation reports 125 false positives at event level and 52.2% hourly precision. These results illustrate the trade-off between detection coverage and alert burden.
- But hour-level recall is 28.9% - we catch the onset of events more reliably than every hour of their duration.
- 785 event hours were missed - mostly through the throughput-driven blind spot (a high-throughput event lowers intensity by construction).
- 292 false-positive hours - reduce by requiring ≥6-hour runs (planned improvement, §7).
7 · Scope & Limitations
Q7 What could make this conclusion wrong?
- L1 - Throughput sensitivity. Changes in the denominator can mask absolute-volume deviations. An absolute-volume detector is a proposed extension requiring separate evaluation.
- L2 - Event-duration lag. Hourly recall was 28.9%, compared with 75.0% planted-event recall. The unflagged 720-hour recovery-upgrade scenario accounted for much of this difference. Detection-delay causes require separate methodological evaluation.
- L3 - Single threshold family. IQR x MAD union is one family; alternative detectors (Isolation Forest, seasonal decomposition) could catch different anomalies. Documented as future work.
- L4 - Synthetic ground truth. The evaluation is honest against planted events. Real facilities have unplanted events (regulatory flaring, emergency operations) not represented here.
SIMULATION AND FIELD APPLICABILITY
- Synthetic data supports controlled experiments with known scenario truth. It does not substitute for field validation.
- The simulation provides a controlled environment for testing methodology. Application to live SCADA records requires separate validation.
- Add a second detector on absolute flared volume (addresses L1).
- Introduce a 6-hour minimum run-length on alerts (addresses L2 and many FPs).
- Migrate to real hourly flaring data and revalidate against external benchmarks (addresses L4).
8 · Statement of Integrity & Conflict of Interest
Recorded SHA-256 Integrity Fingerprints
| Artefact | SHA-256 Fingerprint |
|---|---|
06_Analysis/analysis_table.csv | 5676b755b632d189... |
07_Evaluation/evaluation_metrics.json | d0fd7ead51e8e8f3... |
Source-file hashes and full re-run instructions are in §6 (Reproducibility Manifest).
This project was conducted independently. No funding, data, or analysis was influenced by the equipment manufacturers, operators, or regulatory bodies mentioned in this report.
9 · References
- World Bank (2024) - Global Gas Flaring Tracker Report.
- JCGM 100:2008 - Evaluation of measurement data: Guide to the expression of uncertainty in measurement (GUM).
- ISO 8000-61:2016 - Data quality - Process reference model.
- EPA 40 CFR Part 60, Subpart OOOOa - Standards of performance for crude oil and natural gas facilities.
- Montgomery, D. C. (2019) - Introduction to Statistical Quality Control (8th ed.). Wiley.
- Tukey, J. W. (1977) - Exploratory Data Analysis. Addison-Wesley.
About KANON
KANON helps industrial organizations evaluate gas flaring measurement data, investigate operational anomalies and strengthen the evidence supporting emissions analysis.
[email protected] · kanondata.com